Air Date* |
Episode Title |
Episode synopsis |
| 1/2/10 |
Eat-In-Kitchen: Demolition |
(2306) The Hometime crew takes a small kitchen and starts work to improve storage and functionality. |
| 1/9/10 |
Eat-In-Kitchen: Cabinets |
(2307) The Hometime crew installs new kitchen cabinets, a new sliding door and new floor tile. |
| 1/16/10 |
Eat-In-Kitchen: Wrap Up |
(2308) The Hometime crew installs countertops and appliances, as well as a new wood floor for the adjacent living room. |
| 1/23/10 |
Sculpture Studio: Framing |
(2309) The Hometime crew converts an unused, tuck-under garage into a metal-working studio with a new heater and a downsized garage door. |
| 1/30/10 |
Sculpture Studio: Finishing |
(2310) The Hometime crew wraps up the workshop with doors, windows and welding equipment. |
| 2/6/10 |
Sculpture Studio Extension – Floor |
(2401) The Hometime crew uses pavers and retaining walls to capture space under a second-story deck. (Part 1 of 3) |
| 2/13/10 |
Sculpture Studio Extension – Walls |
(2402) The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck. (Part 2 of 3) |
| 2/20/10 |
Sculpture Studio Extension – Wrap-Up |
(2403) The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture. (Part 3 of 3) |
| 2/27/10 |
Stone Cottage –
Cul-De-Sac Prep |
(2404) The Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirteen-part series focusing on this well-designed, state-of-the-art home. (Part 1 of 13)
|
| 3/6/10 |
Stone Cottage –
Concrete & Foam |
(2405) The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls. (Part 2 of 13)
|
| 3/13/10 |
Stone Cottage –
Instant House |
(2406) The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation. (Part 3 of 13)
|
| 3/20/10 |
Stone Cottage –
Roofscape |
(2407) The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place. (Part 4 of 13)
|
| 3/27/10 |
Stone Cottage – Windows |
(2408) The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system. (Part 5 of 13)
|
| 4/3/10 |
Stone Cottage – Concrete Floors |
(2409) The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors. (Part 6 of 13)
|
| 4/10/10 |
Stone Cottage – Inner Workings |
(2410) The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding. (Part 7 of 13) |
| 4/17/10 |
Stone Cottage – Insulation |
(2411) The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation. (Part 8 of 13) |
| 4/24/10 |
Stone Cottage – Geothermal |
(2412) The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment. (Part 9 of 13)
|