|
Episode Title |
|
| 1/5/13 |
Exterior Harmony: Windows |
(2524) Hometime explores the blending of exterior elements in new home constructions with a focus on windows as well as the installation of a landscape bridge. |
| 1/12/13 |
Exterior Harmony: Roofing |
(2525) Dean and Miriam frame and deck the new landscape bridge as the home’s roof gets covered with copper and synthetic slate. |
| 1/19/13 |
Exterior Harmony: Siding |
(2526) The new landscape bridge is ready for railings and a beautiful set of steps as the new home gets a complete system of siding, soffits, fascia and trim. |
| 1/26/13 |
Exterior Harmony: Doors and Stone |
(2601) The new home’s architecture is enhanced with continuity of garage doors, entry doors and shutters as the foundation is covered with natural thin veneer stone. |
| 2/2/13 |
Log Cabin Systems 1 |
(2701 Updating critical vacation home systems with state of the art filtration and microbe inoculation |
| 2/9/13 |
Log Cabin Systems 2 |
(2702) Updating plumbing and home security systems |
| 2/16/13 |
Creekside Home Preview |
(2703) Getting ready for new home construction with coverage of plans, foundation materials and proper silt fence techniques |
| 2/23/13 |
Creekside Home Foundation |
(2704) Placing and filling energy-saving insulated concrete forms for the new home foundation |
| 3/2/13 |
Exterior Harmony: Driveway & Walkway |
(2602,) Dean, Miriam, Dan and Bucky pitch in to install a paver driveway, walkway and step veneer. |
| 3/9/13 |
Exterior Harmony: Landscape Wrap |
(2614) Finishing a hilly back yard with landscape steps and tile, a fire ring, plants and sprinklers. |
| 3/16/13 |
North Woods Trees |
(2615) Planting site-appropriate trees after a storm and building a crib for firewood cut and split from the damaged timber. |
| 3/23/13 |
Timber Shed Wall Framing |
(2616) Pre-building timber frame walls inside and re-building on a new slab near Hometime Log Cabin. |
| 3/30/13 |
Timber Shed Roof Framing |
(2617) Pre-building timber frame style roof trusses inside and re-assembling those on site as shed construction continues. |
| 4/6/13 |
Creekside Home Framing |
(2705) The new home’s walls ICF foundation walls are poured on site and the framed walls are pre-built at a factory. |
| 4/13/13 |
Creekside Home Dormers |
(2706) Setting pre-cast hollow core panels, laying drainage pipe around the foundation and framing the basement. |
| 4/20/13 |
Creekside Home Roofing |
(2707) Setting first floor trusses and walls on site while previewing the reclaimed lumber to be used for the home's decorative timber frame trusses. |
| 4/27/13 |
Creekside Home Stone |
(2708) Setting the second floor trusses and walls as plans for the roof framing are finalized. |
| 5/4/13 |
Timber Shed Doors |
(2624) Installing custom carriage house doors and laying a system of tailored pavers. |
| 5/11/13 |
Timber Shed Roof and Stone |
(2625) Installing clay tile roofing and natural stone cladding for the walls. |
| 5/18/13 |
Timber Shed Finishing Touches |
(2626) Finishing up the exterior and getting the new shed ready for winter. |
| 5/25/13 |
Log Cabin Systems 1 |
(2701 Updating critical vacation home systems with state of the art filtration and microbe inoculation |
| 6/1/13 |
Log Cabin Systems 2 |
(2702) Updating plumbing and home security systems |
| 6/8/13 |
Creekside Home Trusses |
(2709) Installing trusses and sheathing and visiting the timber framers. |
| 6/15/13 |
Creekside Home Timbers |
(2710) Hanging timber frame trusses over the great room. |
| 6/22/13 |
Creekside Home Windows |
(2711) Drying in the home and installing windows properly. |
| 6/29/13 |
Creekside Home Siding |
(2712) Getting ready for stone installation and visiting a quarry to see how it's fabricated |
| 7/6/13 |
Stamped Concrete Patio Demo |
(2618) Taking out old concrete to repair, reframe and reseal the patio over a storage area. |
| 7/13/13 |
Stamped Concrete Patio Re-Poured |
(2619) Re-pouring and re-stamping the concrete patio while fixing up the storage area below. |
| 7/20/13 |
Built-In Gas Grill |
(2620) Resetting an outdoor natural stone island, covering it with granite and setting a new built-in gas grill. |
| 7/27/13 |
Island Kitchen 2.0: Cabinets |
(2621) Updating an island kitchen with new cabinets includes visits with the designer and the manufacturer. |
| 8/3/13 |
Island Kitchen 2.0: Countertops |
(2622) Finishing up the new cabinets for the island kitchen and covering those with new countertops. |
| 8/10/13 |
Island Kitchen 2.0: Appliances |
(2623) Installing lights, plumbing fixtures and appliances. |
8/17/13 |
Creekside Home Framing |
(2705) The new home’s walls ICF foundation walls are poured on site and the framed walls are pre-built at a factory. |
| 8/24/13 |
Creekside Home Dormers |
(2706) Setting pre-cast hollow core panels, laying drainage pipe around the foundation and framing the basement. |
| 8/31/13 |
Creekside Home Roofing |
(2707) Setting first floor trusses and walls on site while previewing the reclaimed lumber to be used for the home's decorative timber frame trusses. |
| 9/7/13 |
Creekside Home Trusses |
(2709) Installing trusses and sheathing and visiting the timber framers. |
| 9/14/13 |
Creekside Home Timbers |
(2710) Hanging timber frame trusses over the great room. |
| 9/21/13 |
Creekside Home Windows |
(2711) Drying in the home and installing windows properly. |
| 9/28/13 |
Creekside Home Siding |
(2712) Getting ready for stone installation and visiting a quarry to see how it's fabricated |