HOW-TO INFO ON TV STORE ABOUT US SEARCH
transparent
transparent transparent
 
 
transparenttransparent
On TV
transparent transparent
Past Shows
PBS Syndication PBS Syndication
 
Broadcast Partners

2009 PBS Schedule

Episode Title
Town Home: Cleaning Up
Dean, Miriam and the Hometime crew plaster the fireplace chase, install the central vac, and clean construction dust out of the ductwork.
Town Home: Fixtures
Dean, Miriam and the Hometime crew work on closet organizers, a custom metal railing, and the home electronics bells and whistles.
Town Home: Hardware
Dean, Miriam and the Hometime crew put a home office and bedroom in the loft and get the fireplace heated up.
Town Home: Finale
Dean, Miriam and the Hometime crew wrap up the furnishings, the home theater and some unique digital artwork.
Garage Update
Dean, Miriam and the Hometime crew restore the garage floor, upgrade the cabinets and storage, and add a stamped “tin” ceiling.
Digging Out the Yard
(2301) The Hometime crew re-grades a sloping back yard, installs a drainage system, and begins building a series of paver patios.
Urban Terraces
(2302) The Hometime crew weaves several retaining walls, steps, and patios into a small, sloped back yard.
Caretaker's Home
(2303) The Hometime crew restores the porch of what was once the caretaker’s home on a 40-acre, turn-of-the-century lakeside estate.
Entrance Plaza
(2304) The Hometime crew renovates a church courtyard with a textured concrete walkway, custom wood benches, and a raised planting bed.
Accessible Bathroom – Reframing
Dean, Miriam and the Hometime crew start to convert three main floor rooms into a wheelchair accessible master suite.
Accessible Bathroom – Finishing
Dean, Miriam and the Hometime crew finish the accessible bathroom with special counters, plumbing fixtures and furnishings.
Revitalizing Blah Bathrooms
Dean, Miriam and the Hometime crew gut and rearrange two out-of-date bathrooms.
Rainfall Shower
Dean, Miriam and the Hometime crew install marble floor tile and countertops and wrap up with an elaborate shower system.
Betsy-Tacy Home: Decoration
(2305) The Hometime crew makes its last visit to this historic home to create a sidewalk outside and to finish painting and wallpapering the interior.
Eat-In-Kitchen: Demolition
(2306) The Hometime crew takes a small kitchen and starts work to improve storage and functionality.
Eat-In-Kitchen: Cabinets
(2307) The Hometime crew installs new kitchen cabinets, a new sliding door and new floor tile.
Eat-In-Kitchen: Wrap Up
(2308) The Hometime crew installs countertops and appliances, as well as a new wood floor for the adjacent living room.
Sculpture Studio: Framing
(2309) The Hometime crew converts an unused, tuck-under garage into a metal-working studio with a new heater and a downsized garage door.
Sculpture Studio: Finishing
(2310) The Hometime crew wraps up the workshop with doors, windows and welding equipment.
Paver Driveway and Sidewalk (2216) Dean, Miriam and the Hometime crew replace the bland, deteriorating asphalt with concrete pavers.
Rocks & Trees (2217) The Hometime crew clears and plants an overgrown hill then builds an outdoor staircase with boulders and slabs of stone.
Half-Finished Shed (2218) The Hometime crew jumps in to finish off an ambitious backyard shed when the homeowner is deployed overseas with the National Guard.
Shed Finale (2219) The Hometime crew wraps up the shed with roofing, flooring and paneling.
Stone Retaining Wall (2220) The Hometime crew builds a stone wall, then plants and irrigates a hillside.
Basement Headroom (2221) Dean, Miriam and the Hometime crew reclaim unusable basement space by abating the asbestos, removing low-hanging pipes, and re-working drains in the floor.
Patching the Slab (2222) Dean, Miriam and the Hometime crew work with the radon mitigation contractor, re-pour some of the concrete floor, and get the basement spaces wired.
Basement Plaster (2223) Dean, Miriam and the Hometime crew finish the basement walls with an improvised plaster texture to match the original 1926 surfaces.
Basement Flooring (2224) The Hometime crew installs ceramic tile, cork floors and stair treads in a basement.
Basement Fixtures (2225) The Hometime crew installs plumbing and laundry fixtures and cabinets for an entertainment center.
Highland Landscape Wrap (2226) The Hometime crew builds a pergola to shelter a spa.
Digging Out the Yard
(2301) The Hometime crew re-grades a sloping back yard, installs a drainage system, and begins building a series of paver patios.
Urban Terraces
(2302) The Hometime crew weaves several retaining walls, steps, and patios into a small, sloped back yard.
Caretaker's Home
(2303) The Hometime crew restores the porch of what was once the caretaker’s home on a 40-acre, turn-of-the-century lakeside estate.
Entrance Plaza
(2304) The Hometime crew renovates a church courtyard with a textured concrete walkway, custom wood benches, and a raised planting bed.
Betsy-Tacy Home: Decoration
(2305) The Hometime crew makes its last visit to this historic home to create a sidewalk outside and to finish painting and wallpapering the interior.
Great Room Hardwood Floor
(2311) The Hometime crew installs a super-hard, prefinished wood floor.
Travertine Floor
(2312) The Hometime crew installs large-format limestone flooring.
Seven-Year Plan
(2313) The Hometime crew works with a designer to identify and prioritize a house-wide makeover. Then they begin with the first phase: tearing apart the living room and dining room.
Kitchen Facelift
(2314) The Hometime crew transforms a kitchen with re-faced cabinets along with new counters, tile, appliances and lighting.
Great Room Update
(2315) The Hometime crew uses new trim, wood flooring, lighting, paint and furniture to transform a dated, 1970s living room and dining room.
Linoleum Flooring
(2316) The Hometime crew installs sheet and tile linoleum on the Hometime log cabin basement floor.
Cabin Kitchen Upgrade
(2317) The Hometime crew modifies and upgrades cabinets, appliances, countertops and plumbing fixtures.
Vacation Home Laundry Room
(2318) The Hometime crew adds new cabinets and plumbing fixtures to a log cabin lower level.
Historic Summer Home -- Structural Upgrades
(2319) Dean, Miriam and the Hometime crew remove cabinets, asbestos flooring and a concrete slab then ingeniously reinforce sagging walls and pour a new concrete kitchen floor.
Historic Summer Home -- Kitchen
(2320) Dean, Miriam and the Hometime crew rebuild old cabinets and install historically sensitive countertops, flooring, fixtures and appliances remodeling this 100-year-old kitchen.
Barrel Vault Basement
(2321) The Hometime crew transforms a bland, unfinished basement by juggling doors and windows, repairing humps and cracks in the floor, and creating an arched ceiling. (Part 1 of 3)
Party Kitchen
(2322) The Hometime crew puts in doors, tile and cabinets for the basement wet bar and peninsula. (Part 2 of 3)
Arched Wood Panels (2323) The Hometime crew puts in granite countertops and a trendy shower door then wrap up the custom wood paneling around a basement fireplace. (Part 3 of 3)
Attic Trusses
(2324) The Hometime crew shores up the block walls then uses attic trusses to create a room over a flat-roofed, detached garage. (Part 1 of 3)
Standalone Garage (2325) The Hometime crew seals up the exterior of the garage and the new studio above it. (Part 2 of 3)
Yoga Studio (2326) The upstairs studio gets paint, flooring, and lighting.  The downstairs garage gets flooring and cabinets. (Part 3 of 3)
Betsy-Tacy Home: Decoration
(2305) The Hometime crew makes its last visit to this historic home to create a sidewalk outside and to finish painting and wallpapering the interior.