HOW-TO INFO ON TV STORE ABOUT US SEARCH
transparent
transparent transparent
 
 
transparenttransparent
On TV
transparent transparent
Past Shows
PBS Syndication PBS Syndication
 
Broadcast Partners

2010 PBS Schedule

Episode Title
Eat-In-Kitchen: Demolition
(2306) The Hometime crew takes a small kitchen and starts work to improve storage and functionality.
Eat-In-Kitchen: Cabinets
(2307) The Hometime crew installs new kitchen cabinets, a new sliding door and new floor tile.
Eat-In-Kitchen: Wrap Up
(2308) The Hometime crew installs countertops and appliances, as well as a new wood floor for the adjacent living room.
Sculpture Studio: Framing
(2309) The Hometime crew converts an unused, tuck-under garage into a metal-working studio with a new heater and a downsized garage door.
Sculpture Studio: Finishing
(2310) The Hometime crew wraps up the workshop with doors, windows and welding equipment.
Sculpture Studio Extension – Floor
(2401) The Hometime crew uses pavers and retaining walls to capture space under a second-story deck. (Part 1 of 3)
Sculpture Studio Extension – Walls
(2402) The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck. (Part 2 of 3)
Sculpture Studio Extension – Wrap-Up
(2403) The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture. (Part 3 of 3)
Stone Cottage – Cul-De-Sac Prep
(2404) The Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirteen-part series focusing on this well-designed, state-of-the-art home. (Part 1 of 22)
Stone Cottage – Concrete & Foam
(2405) The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls. (Part 2 of 22)
Stone Cottage – Instant House
(2406) The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation. (Part 3 of 22)
Stone Cottage – Roofscape
(2407) The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place. (Part 4 of 22)
Stone Cottage – Windows
(2408) The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system. (Part 5 of 22)
Stone Cottage – Concrete Floors
(2409) The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors. (Part 6 of 22)
Stone Cottage – Inner Workings
(2410) The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding. (Part 7 of 22)
Stone Cottage – Insulation
(2411) The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation. (Part 8 of 22)
Stone Cottage – Geothermal
(2412) The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment. (Part 9 of 22)
5/1/10 Great Room Hardwood Floor
(2311) The Hometime crew installs a super-hard, prefinished wood floor.
5/8/10 Travertine Floor
(2312) The Hometime crew installs large-format limestone flooring.
5/15/10 Seven-Year Plan
(2313) The Hometime crew works with a designer to identify and prioritize a house-wide makeover. Then they begin with the first phase: tearing apart the living room and dining room.
5/22/10 Kitchen Facelift
(2314) The Hometime crew transforms a kitchen with re-faced cabinets along with new counters, tile, appliances and lighting.
5/29/10 Great Room Update
(2315) The Hometime crew uses new trim, wood flooring, lighting, paint and furniture to transform a dated, 1970s living room and dining room.
6/5/10 Linoleum Flooring
(2316) The Hometime crew installs sheet and tile linoleum on the Hometime log cabin basement floor.
6/12/10 Cabin Kitchen Upgrade
(2317) The Hometime crew modifies and upgrades cabinets, appliances, countertops and plumbing fixtures.
6/19/10 Vacation Home Laundry Room
(2318) The Hometime crew adds new cabinets and plumbing fixtures to a log cabin lower level.
6/26/10 Barrel Vault Basement
(2321) The Hometime crew transforms a bland, unfinished basement by juggling doors and windows, repairing humps and cracks in the floor, and creating an arched ceiling. (Part 1 of 3)
7/3/10 Party Kitchen
(2322) The Hometime crew puts in doors, tile and cabinets for the basement wet bar and peninsula. (Part 2 of 3)
7/10/10 Arched Wood Panels (2323) The Hometime crew puts in granite countertops and a trendy shower door then wrap up the custom wood paneling around a basement fireplace. (Part 3 of 3)
Historic Summer Home -- Structural Upgrades
(2319) Dean, Miriam and the Hometime crew remove cabinets, asbestos flooring and a concrete slab then ingeniously reinforce sagging walls and pour a new concrete kitchen floor.
Historic Summer Home -- Kitchen
(2320) Dean, Miriam and the Hometime crew rebuild old cabinets and install historically sensitive countertops, flooring, fixtures and appliances remodeling this 100-year-old kitchen.
Sculpture Studio Extension – Floor
(2401) The Hometime crew uses pavers and retaining walls to capture space under a second-story deck. (Part 1 of 3)
Sculpture Studio Extension – Walls
(2402) The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck. (Part 2 of 3)
Sculpture Studio Extension – Wrap-Up
(2403) The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture. (Part 3 of 3)
Attic Trusses
(2324) The Hometime crew shores up the block walls then uses attic trusses to create a room over a flat-roofed, detached garage. (Part 1 of 4)
Standalone Garage (2325) The Hometime crew seals up the exterior of the garage and the new studio above it. (Part 2 of 4)
Yoga Studio (2326) The upstairs studio gets paint, flooring, and lighting.  The downstairs garage gets flooring and cabinets. (Part 3 of 4)
His and Her Garage (2413) The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for “him.” (Part 4 of 4)
Stone Cottage -- Interior Walls
(2414) After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings. (Part 10 of 22)
Stone Cottage -- Vaulted Ceiling (2415) The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms. (Part 11 of 22)
Stone Cottage -- Millwork
(2416) Wooden beams are built outside for the porches.  Inside, hardwood trim wainscoting is installed. (Part 12 of 22)
Stone Cottage -- Exterior Doors (2417)  The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling. (Part 13 of 22)
Stone Cottage -- Tile (2418) The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls. (Part 14 of 22)
Stone Cottage -- Driveway (2419) The Hometime crew installs the paver driveway, as well as the master bathroom cabinets. (Part 15 of 22)
Stone Cottage -- Interior Doors (2420) The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns. (Part 16 of 22)
Stone Cottage -- Laundry Room (2421) The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.  (Part 17 of 22)
Stone Cottage -- Office (2422) The home office begins to take shape, as the custom staircase work begins. (Part 18 of 22)
Stone Cottage -- Countertops (2423) The stone countertops are fabricated and installed. (Part 19 of 22)
Stone Cottage -- Fixtures & Appliances (2424) The Hometime crew installs cabinets, countertops and landscaping. (Part 20 of 22)
Attic Trusses
(2324) The Hometime crew shores up the block walls then uses attic trusses to create a room over a flat-roofed, detached garage. (Part 1 of 4)
Standalone Garage (2325) The Hometime crew seals up the exterior of the garage and the new studio above it. (Part 2 of 4)
Yoga Studio (2326) The upstairs studio gets paint, flooring, and lighting.  The downstairs garage gets flooring and cabinets. (Part 3 of 4)
His and Her Garage (2413) The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for “him.” (Part 4 of 4)