Air Date* |
Episode Title |
Episode synopsis |
| 9/3/11 |
His & Her Garage |
(S1025) The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for “him.” (Part 4 of 4) |
| 9/10/11 |
Watertight & Energy Efficient |
(S1026) New products to seal up and insulate a home. |
| 9/17/11 |
Kitchen Countertop |
(S1101) Upgrading a tired laminate countertop to the latest quartz material. Also, the newest advances in furnace technology. |
| 9/24/11 |
|
(S1102) A tumbled stone backsplash and a super-efficient heat pump. |
| 10/1/11 |
Stone Cottage –
Cul-De-Sac Prep |
(S1103) The Hometime crew works with surveyors, graders and architects to prepare a building site. |
| 10/8/11 |
Stone Cottage –
Concrete & Foam |
(S1104) The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls. |
| 10/15/11 |
Stone Cottage –
Instant House |
(S1105) The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation. |
| 10/22/11 |
Stone Cottage –
Roofscape |
(S1106) The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place. |
| 10/29/11 |
Stone Cottage – Windows |
(S1107) The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system. |
| 11/5/11 |
Stone Cottage – Concrete Floors |
(S1108) The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors. |
| 11/12/11 |
Stone Cottage – Inner Workings |
(S1109) The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding. |
| 11/19/11 |
His & Her Garage |
(S1025R) The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for “him.” |
| 11/26/11 |
Watertight & Energy Efficient |
(S1026R) New products to seal up and insulate a home. |
| 12/3/11 |
Kitchen Countertop |
(S1101R) Upgrading a tired laminate countertop to the latest quartz material. Also, the newest advances in furnace technology. |
| 12/10/11 |
Kitchen Backsplash |
(S1102R) A tumbled stone backsplash and a super-efficient heat pump. |
| 12/17/10 |
Caretaker’s Home |
(S1007R) The Hometime crew restores the porch of what was once the caretaker’s home on a 40-acre, turn-of-the-century lakeside estate. |
| 12/24/10 |
Panelized House |
(S1017R) Hometime explores the growing trend of pre-building a home in a controlled warehouse setting and then shipping it to a job site for assembly. |
| 12/31/11 |
Idea Homes |
(S1018R) Hometime tours two striking homes on display during a home and garden show and analyzes them with the architects, designers and builders. |
| 1/7/12 |
Stone Cottage – Insulation |
(S1110) The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation. |
| 1/14/12 |
Stone Cottage – Geothermal |
(S1111) The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment. |
| 1/21/12 |
Stone Cottage – Interior Walls |
(S1112) After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings. |
| 1/28/12 |
Stone Cottage – Vaulted Ceiling |
(S1113) The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms. |
| 2/4/12 |
Stone Cottage – Millwork |
(S1114) Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed. |
| 2/11/12 |
Stone Cottage – Exterior Doors |
(S1115) The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling. |
| 2/18/12 |
Stone Cottage – Tile |
(S1116) The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls. |
| 2/25/12 |
Stone Cottage – Driveway |
(S1117) The Hometime crew installs the paver driveway, as well as the master bathroom cabinets. |
| 3/3/12 |
Stone Cottage – Interior Doors |
(S1118) The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns. |
| 3/10/12 |
Stone Cottage – Laundry Room |
(S1119) The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring. |
| 3/17/12 |
Stone Cottage – Office |
(S1120) The home office begins to take shape, as the custom staircase work begins. |
| 3/24/12 |
Stone Cottage – Countertops |
(S1121) The stone countertops are fabricated and installed. |
| 3/31/12 |
Stone Cottage – Fixtures & Appliances |
(S1122) The Hometime crew installs bathroom fixtures and appliances for the kitchen and laundry. |