HOW-TO ARTICLES TV SCHEDULES ABOUT US SEARCH
transparent
transparent transparent
     
transparenttransparent
On TV
transparent transparent
Past Shows
PBS Syndication PBS Syndication
 
Broadcast Partners

Syndication Schedule - 2012/2013 Season

Episode Title Episode synopsis
9/1/12 Timber Shed Wall Framing (S1128R) Pre-building shed walls inside using timber frame techniques and re-building the shed on a new slab outside at the Log Cabin.
9/8/12 Timber Shed Roof Framing (S1129R) Finishing the new timber frame roof framing with pre-cutting and fitting inside back home and final assembly at the Log Cabin.
9/15/12 Island Kitchen Cabinets (S1133R) The Island Kitchen update begins with cabinet plan options at the designers, a visit to the factory and installation.
9/22/12 Island Kitchen Countertops (S1134R) Wrapping up the cabinets and installing new countertops.
9/29/12 Island Kitchen Appliances (S1135) Finishing up the island kitchen with new appliances and lighting.
10/6/12 Timber Shed Doors (S1132R) Construction resumes on the north woods shed with a set of custom carriage house style doors and paver flooring inside.
10/13/12 Timber Shed Roof and Stone (S1201) Wrapping up the exterior portion of the paver treatment in front of the shed and starting both the clay tile roofing and the natural stone siding.
10/20/12 Island Kitchen Cabinets (S1133R2) The Island Kitchen update begins with cabinet plan options at the designers, a visit to the factory and installation.
10/27/12 Island Kitchen Countertops (S1134R2) Wrapping up the cabinets and installing new countertops.
11/3/12 Island Kitchen Appliances (S1135R) Finishing up the island kitchen with new appliances and lighting.
11/10/12 Stone Cottage – Finishing the Trim (S1202) Varnishing the cherry millwork, applying stone on the basement fireplace and wrapping up the irrigation.
11/17/12 Stone Cottage – Porch Railing (S1203) The metal railing gets built, sandblasted, powder coated and installed while the garage walls and ceiling are paneled.
11/24/12 Stone Cottage – Lighting (S1204) The recessed lights, hanging lights, and surface-mounted fixtures are installed.
12/1/12 Stone Cottage – Kitchen & Baths (S1205) Installation of state-of-the-art lighting controls, undercabinet lights, and mirrors finishes off the kitchen and bathrooms.
12/8/12 Timber Shed Finishing Up (S1206) Installing windows, wood-burning stove with stainless steel chimney, mortise hardware and storage system.
12/15/12 Stone Cottage – Lower Level (S1207) Finishing the gas fireplace, wet bar tile and workshop walls and ceiling.
12/22/12 Stone Cottage – Storage (S1208) Installing cabinets and hanging storage for the garage and the workshop.
12/29/12 Stone Cottage – Carpet (S1209) Preparing and installing area rugs, stair runners and wall-to-wall carpet and testing out the new central vacuum.
1/5/13 Stone Cottage – Electronics (S1210) Installing and operating the home theater, the lighting control system, and the whole-house audio.
1/12/13 Clean, Green and Efficient (S1211) Critical septic and electrical upgrades for a vacation home
1/19/13 Security Goes Wireless (S1212) Wireless home security components, anti-scald, thermostatic bath valves and lead-safe remodeling practices
1/26/13 Stone Cottage – Closet Organizers (S1213) Hometime explores the storage options for closets and installs a discrete fireplace screen
2/2/13 Stone Cottage – Wine Cellar (S1214) Hometime builds a sophisticated wine cellar racking system and installs a climate control unit
2/9/13 Stone Cottage – Side Porch (S1215) Hometime builds massive decorative wood brackets and gives a new kitchen a test run with a local celebrity chef
2/16/13 Stone Cottage – Workshop (S1216) Sophisticated tool storage systems and a custom workbench
2/23/13 Stone Cottage – Home Theater (S1217) The latest in TV technology and automated controls for entertainment equipment
3/2/13 Stone Cottage – Outdoor Kitchen Island (S1218) Hometime builds an outdoor cooking island and anchors an outdoor lamp post.  Plus an explanation of the computerized lighting system.
3/9/13 Stone Cottage – Built-In Grill (S1219) Hometime sets an outdoor grill into a stone and granite island. Also, the mechanics of a modern player piano.
3/16/13 Stone Cottage – Mailbox & Flower Box (S1220) Thoughtful design and careful carpentry tie mailboxes and a flower box to the architectural style of a home.
3/23/13 Stone Cottage – Cottage Expressions (S1221) Building full extension drawers, attaching snow guards and exploring a home’s cottage style.
3/30/13 Stone Cottage – Insulation
(S1110R) The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.
4/6/13 Stone Cottage – Geothermal
(S1111R) The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.
4/13/13 Stone Cottage – Interior Walls
(S1112R) After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.
4/20/13 Stone Cottage – Vaulted Ceiling (S1113R) The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.
4/27/13 Stone Cottage – Millwork (S1114R) Wooden beams are built outside for the porches.  Inside, hardwood trim wainscoting is installed.
5/4/13 Stone Cottage – Exterior Doors (S1115R)  The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.
5/11/13 Stone Cottage – Tile (S1116R) The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.
5/18/13 Stone Cottage – Driveway (S1117R) The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.
5/25/13 Stone Cottage – Interior Doors (S1118R) The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.
6/1/13 Stone Cottage – Laundry Room (S1119R) The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.
6/8/13 Stone Cottage – Office (S1120R) The home office begins to take shape, as the custom staircase work begins.
6/15/13 Stone Cottage – Countertops (S1121R) The stone countertops are fabricated and installed.
6/22/13 Stone Cottage – Fixtures & Appliances (S1122R) The Hometime crew installs bathroom fixtures and appliances for the kitchen and laundry.
6/29/13 Stone Cottage – Retractable Screens (S1123R) The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed. 
7/6/13 Stone Cottage – Sod & Stone (S1124R) The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.
7/13/13 Stone Cottage – Finishing the Trim (S1202R) Varnishing the cherry millwork, applying stone on the basement fireplace and wrapping up the irrigation.
7/20/13 Stone Cottage – Porch Railing (S1203R) The metal railing gets built, sandblasted, powder coated and installed while the garage walls and ceiling are paneled.
7/27/13 Stone Cottage – Lighting (S1204R) The recessed lights, hanging lights, and surface-mounted fixtures are installed.
     

* Please check local listings for exact airdates and times.