HOW-TO INFO ON TV STORE ABOUT US SEARCH
transparent
transparent transparent
 
 
transparenttransparent
On TV
transparent transparent
Past Shows
PBS Syndication PBS Syndication
 
Broadcast Partners

2008 Syndication Schedule

Episode synopsis
1/5/08 Marble Bathrooms Dean, Miriam and the Hometime crew help with marble floors, marble walls and marble countertops in two adjacent bathrooms.
1/12/08 Rainfall Shower
Dean, Miriam and the Hometime crew install an elaborate shower system.
1/19/08 Historic Summer Home - Kitchen Demo
Dean, Miriam and the Hometime crew remove cabinets, asbestos flooring and a concrete slab.
1/26/08 Historic Summer Home – Structural Upgrades
Dean, Miriam and the Hometime crew ingeniously reinforce sagging walls and pour a new concrete kitchen floor.
2/2/08 Historic Summer Home - Kitchen
Dean, Miriam and the Hometime crew rebuild old cabinets and install countertops and flooring.
2/9/08 Historic Summer Home – Appliances & Fixtures
Dean, Miriam and the Hometime crew use historically sensitive fixtures and appliances remodeling this 100-year-old kitchen.
2/16/08 Rambler Makeover – Landscaping
Almost three years of interior remodeling on this home have taken a big toll on the yards. Dean, Miriam and the Hometime crew work to restore and upgrade the landscape.
2/23/08 Rambler Makeover - Finale
Dean, Miriam and the Hometime crew install cork flooring and a fireplace inside and wrap up the drip irrigation outside.
3/1/08 Sprucing Up a Deck
Dean, Miriam and the Hometime crew take a structurally sound deck and rejuvenate it with new deck boards, railings and landscaping.
3/8/08 Backyard Clean Slate
(S704R) Dean, Miriam and the Hometime crew prepare a cluttered backyard for a new patio, fence and water feature.
3/15/08 Ashlar Paver Patio
(S705R) Dean, Miriam and the Hometime crew install a tumbled paver patio with plenty of circles and curves.
3/22/08 Boulder Waterfall
(S706) Dean, Miriam and the Hometime crew use some oversized boulders to create a backyard water feature.
3/29/08 Vinyl Fencing
(S707R) Dean, Miriam and the Hometime crew put up a maintenance free fence, insulate an attic and install a new roof.
4/5/08 Barrel Vault Basement
(S713) Dean, Miriam and the Hometime crew start to transform a bland, unfinished basement by juggling doors and windows and framing an arched ceiling.
4/12/08 Finishing an Arched Ceiling
(S714) Dean, Miriam and the Hometime crew repair cracks and humps in the basement floor and finish off the barrel vault in the ceiling.
4/19/08 Party Kitchen
(S715) Dean, Miriam and the Hometime crew put in the doors, tile and cabinets for the wet bar and peninsula.
4/26/08 Basement Stone & Tile
(S716) Dean, Miriam and the Hometime crew install floor tile, wall tile and stone around the fireplace.
5/3/08 Arched Wood Panels
(S717) Dean, Miriam and the Hometime crew put in granite countertops and a trendy shower door then wrap up the custom wood paneling in the basement.
5/10/08 Wine Cellar Prep
(S718) Dean, Miriam and the Hometime crew take the special steps needed to prepare a wine cellar.
5/17/08 Wine Cellar Racks
(S719) Dean, Miriam and the Hometime crew break out all the woodworking tools to build wine racks from scratch.
5/24/08 Basement Flooring
(S720) Dean, Miriam and the Hometime crew put down old-fashioned linoleum with new floating floor technology.
5/31/08 Shop and Fitness Room Walls
(S721) Dean, Miriam and the Hometime crew cover the basement walls with pine wainscoting, polyurethane trim and diamond plate metal tiles.
6/7/08 Basement Goodies
(S722) Dean, Miriam and the Hometime crew finish off the project with a gun safe, a wine cellar cooler and an exquisite slop sink.
6/14/08 Historic Summer Home -- Kitchen Demo
Dean, Miriam and the Hometime crew remove cabinets, asbestos flooring and a concrete slab.
6/21/08 Historic Summer Home – Structural Upgrades
Dean, Miriam and the Hometime crew ingeniously reinforce sagging walls and pour a new concrete kitchen floor.
6/28/08 Historic Summer Home -- Kitchen
Dean, Miriam and the Hometime crew rebuild old cabinets and install countertops and flooring.
7/5/08 Historic Summer Home – Appliances & Fixtures
Dean, Miriam and the Hometime crew use historically sensitive fixtures and appliances remodeling this 100-year-old kitchen.
7/12/08 Drying Out an Office
(S730R) Dean, Miriam and the Hometime crew tear out moldy carpet and replace a rotted patio door in a basement home office.
7/19/08 Pint-Sized Fireplace
(S731R) Dean, Miriam and the Hometime crew install a small gas fireplace in custom-fitted cabinetry to warm up a basement home office.
7/26/08 Fold-Down Bed
(S732R) Dean, Miriam and the Hometime crew install cork flooring and a fold-down bed in a home office, and build a flagstone patio outside.
8/2/08 Dividing The Baths
(S727R) Dean, Miriam and the Hometime crew help former Hometime cohost JoAnne Liebeler demolish her main floor bathroom.
8/9/08 Glass and Tile
(S728R) Dean, Miriam and the Hometime crew install an etched window and a diagonal tile floor in a master bathroom.
8/16/08 Eclectic Oriental Bathroom
(S729R) Dean, Miriam and the Hometime crew use contrasting colors and clean lines to transform the feel of an ordinary 80’s bathroom and bedroom.
8/23/08 Seven-Year Plan
(S723) Dean, Miriam and the Hometime crew work with a designer to identify and prioritize a house-wide makeover. Then they begin with the first phase: tearing apart the living room and dining room.
Sprucing Up a Deck (S703R) Dean, Miriam and the Hometime crew take a structurally sound deck and rejuvenate it with new deck boards, railings and landscaping.
9/6/2008 Furnace and Cabinets (S801) Dean, Miriam and the Hometime crew create a built-in dining room buffet and upgrade the HVAC system.
9/13/2008 Wine Cellar Prep (S718R) Dean, Miriam and the Hometime crew take the special steps needed to prepare a wine cellar.
9/20/2008 Wine Cellar Racks (S719R) Dean, Miriam and the Hometime crew break out all the woodworking tools to build wine racks from scratch.
9/27/2008 Basement Flooring (S720R) Dean, Miriam and the Hometime crew put down old-fashioned linoleum with new floating floor technology.
10/4/2008 Shop and Fitness Room Walls (S721R) Dean, Miriam and the Hometime crew cover the basement walls with pine wainscoting, polyurethane trim and diamond plate metal tiles.
10/11/2008 Basement Goodies (S722R) Dean, Miriam and the Hometime crew finish off the project with a gun safe, a wine cellar cooler and an exquisite slop sink.
10/18/2008 Ravages of Moisture (S802) The Hometime crew examines and repairs extensive rot problems on a home that is only 20 years old.
10/25/2008 Rebuilding a Window Wall (S803) The Hometime crew works on three stories of a new home, replacing windows and siding.
11/1/2008 Exterior Details (S804) The Hometime crew wraps up some exterior repairs by patching the interior walls and then adding a new deck railing and flowerboxes.
11/8/2008 Granite Countertop (S805) With a few strategic updates the Hometime crew brings a 1980s kitchen into the 21st century.
11/15/2008 Decorating Updates (S806) Exterior repairs have left every room in this house in need of painting. The Hometime crew demonstrates a variety of repair, painting and decorating techniques.
11/22/2008 Betsy-Tacy House --Demolition (S807) The Hometime crew returns to the home that was the setting for the “Betsy-Tacy” children’s novels to gut the interior and repair the framing.
11/29/2008 Betsy-Tacy House -- Insulation & Drywall (S808) Dean, Miriam and the Hometime crew help a preservation group rebuild the interior of this historic home.
12/6/2008 Kitchen Facelift (S809) The Hometime crew transforms a kitchen with re-faced cabinets along with new counters, tile, appliances and lighting.
12/13/2008 Great Room Update (S810) The Hometime crew uses new trim, wood flooring, lighting, paint and furniture to transform a dated, 1970s living room and dining room.
12/20/2008 Barrel Vault Basement (S713R) Dean, Miriam and the Hometime crew start to transform a bland, unfinished basement by juggling doors and windows and framing an arched ceiling.
12/27/2008 Finishing an Arched Ceiling (S714R) Dean, Miriam and the Hometime crew repair cracks and humps in the basement floor and finish off the barrel vault in the ceiling.