HOW-TO INFO ON TV STORE ABOUT US SEARCH
transparent
transparent transparent
 
 
transparenttransparent
On TV
transparent transparent
Past Shows
PBS Syndication PBS Syndication
 
Broadcast Partners

2010 Syndication Schedule

Episode synopsis
1/2/10 Ravages of Moisture (S802R) The Hometime crew examines and repairs extensive rot problems on a home that is only 20 years old.
1/9/10 Rebuilding a Window Wall (S803R) The Hometime crew works on three stories of a new home, replacing windows and siding.
1/16/10 Exterior Details (S804R) The Hometime crew wraps up some exterior repairs by patching the interior walls and then adding a new deck railing and flowerboxes.
1/23/10 Granite Countertop (S805R) With a few strategic updates the Hometime crew brings a 1980s kitchen into the 21st century.
1/30/10 Decorating Updates (S806R) Exterior repairs have left every room in this house in need of painting. The Hometime crew demonstrates a variety of repair, painting and decorating techniques.
2/6/10 Stone Retaining Wall (S917) The Hometime crew builds a stone wall, then plants and irrigates a hillside.
2/13/10 Highland Landscape Wrap (S918) The Hometime crew builds a pergola to shelter a spa.
2/20/10 100-Year-Old Porch
(S824R) Dean, Miriam and the Hometime crew pitch in on the careful restoration of the exterior of a turn-of-the-century home.
2/27/10 Bathroom Mirror TV
(S825R) Dean, Miriam and the Hometime crew wire a house for sound and add a TV in the bathroom.
3/6/10 Home Theater Update
(S826R) Dean, Miriam and the Hometime crew showcase the newest home entertainment technologies.
3/13/10 Recycled Fence
(S901R) Dean, Miriam and the Hometime crew take a down a tall cedar privacy fence, re-mill the lumber, and create a “new” picket fence.
3/20/10 Porch and Rail
(S902R) Dean, Miriam and the Hometime crew upgrade the materials and design on a plain vanilla entrance porch. (Part 1 of 2)
3/27/10 Circular Beds
(S903R) Dean, Miriam and the Hometime crew carve up a front yard into circular patios and planting beds. (Part 2 of 2)
4/3/10 Front Yard Boulders
(S911R) The Hometime crew finishes off the front yard with sprinklers, sod, plantings and bluestone boulders.
4/10/10 Betsy-Tacy House --Demolition (S807R) The Hometime crew returns to the home that was the setting for the “Betsy-Tacy” children’s novels to gut the interior and repair the framing.
4/17/10 Betsy-Tacy House -- Insulation & Drywall (S808R) Dean, Miriam and the Hometime crew help a preservation group rebuild the interior of this historic home.
4/24/10 Betsy-Tacy Home: Decoration
(S919) The Hometime crew makes its last visit to this historic home to create a sidewalk outside and to finish painting and wallpapering the interior.
5/1/10 Urban Porch - Framing
(S904R) Dean, Miriam and the Hometime crew add a few more square feet of living space to a small urban home by framing in a second-floor screened porch. (Part 1 of 2)
5/8/10 Urban Porch - Finishing
(S905R) Dean, Miriam and the Hometime crew finish the porch with a custom-built skylight and a floating floor over the rubber roof. (Part 2 of 2)
5/15/10 Garage Update
(S906R) Dean, Miriam and the Hometime crew restore the garage floor, upgrade the cabinets and storage, and add a stamped “tin” ceiling.
5/22/10 Paver Driveway & Sidewalk
(S907R) Dean, Miriam and the Hometime crew replace the bland, deteriorating asphalt with concrete pavers.
5/29/10 Rocks & Trees
(S908R) The Hometime crew clears and plants an overgrown hill then builds an outdoor staircase with boulders and slabs of stone.
6/5/10 Half-Finished Shed (S909R) The Hometime crew jumps in to finish off an ambitious backyard shed when the homeowner is deployed overseas with the National Guard.
6/12/10 Shed Finale (S910R) The Hometime crew wraps up the shed with roofing, flooring and paneling.
6/19/10 Basement Headroom (S912R) Dean, Miriam and the Hometime crew reclaim unusable basement space by abating the asbestos, removing low-hanging pipes, and re-working drains in the floor.
6/26/10 Patching the Slab
(S913R) Dean, Miriam and the Hometime crew work with the radon mitigation contractor, re-pour some of the concrete floor, and get the basement spaces wired.
7/3/10 Basement Plaster (S914R) Dean, Miriam and the Hometime crew finish the basement walls with an improvised plaster texture to match the original 1926 surfaces.
7/10/10 Basement Flooring
(S915R) The Hometime crew installs ceramic tile, cork floors and stair treads in a basement.
7/17/10 Basement Fixtures (S916R) The Hometime crew installs plumbing and laundry fixtures and cabinets for an entertainment center.
7/24/10 Stone Retaining Wall (S917R) The Hometime crew builds a stone wall, then plants and irrigates a hillside.
7/31/10 Highland Landscape Wrap (S918R) The Hometime crew builds a pergola to shelter a spa.
8/7/10 Eat-In-Kitchen – Demolition (S920) The Hometime crew takes a small kitchen and starts work to improve storage and functionality. (Part 1 of 4)
8/14/10 Eat-In-Kitchen – Cabinets (S921) The Hometime crew updates and expands the cabinets in this small kitchen. (Part 2 of 4)
8/21/10 Eat-In-Kitchen – Tile (S922) The Hometime crew installs a tile floor and a tile backsplash. (Part 3 of 4)
8/28/10 Eat-In-Kitchen – Fixtures (S923) The Hometime crew finishes the kitchen and installs new wood flooring and an entry door in the living room. (Part 4 of 4)
9/4/10 Great Room Hardwood Floor (S924) The Hometime crew installs a super-hard, prefinished wood floor.
9/11/10 Travertine Floor (S925) The Hometime crew installs large-format limestone flooring.
9/18/10 Granite Bar Top (S926) The Hometime crew rebuilds a basement entertainment area.
9/25/10 Digging Out the Yard (S1001) The Hometime crew re-grades a sloping back yard, installs a drainage system, and begins building a series of paver patios.  (Part 1 of 2)
10/2/10 Urban Terraces (S1002) The Hometime crew weaves several retaining walls, steps, and patios into a small, sloped back yard.  (Part 2 of 2)
10/9/10 Linoleum Flooring (S1003) The Hometime crew installs sheet and tile linoleum on the Hometime log cabin basement floor.
10/16/10 Cabin Kitchen Upgrade (S1004) The Hometime crew modifies and upgrades cabinets, appliances, countertops and plumbing fixtures.
10/23/10 Vacation Home Laundry Room (S1005) The Hometime crew adds new cabinets and plumbing fixtures to a log cabin lower level.
10/30/10 Heat & Light (S1006) The Hometime crew installs an ultra-efficient furnace and some one-of-a-kind, hand blown glass light fixtures.
11/6/10 Caretaker’s Home (S1007) The Hometime crew restores the porch of what was once the caretaker’s home on a 40-acre, turn-of-the-century lakeside estate.
11/13/10 Entrance Plaza (S1008) The Hometime crew renovates a church courtyard with a textured concrete walkway, custom wood benches, and a raised planting bed.
11/20/10 Eat-In-Kitchen – Demolition (S920R) The Hometime crew takes a small kitchen and starts work to improve storage and functionality. (Part 1 of 4)
11/27/10 Eat-In-Kitchen – Cabinets (S921R) The Hometime crew updates and expands the cabinets in this small kitchen. (Part 2 of 4)
12/4/10 Eat-In-Kitchen – Tile (S922R) The Hometime crew installs a tile floor and a tile backsplash. (Part 3 of 4)
12/11/10 Eat-In-Kitchen – Fixtures (S923R) The Hometime crew finishes the kitchen and installs new wood flooring and an entry door in the living room. (Part 4 of 4)
12/18/10 Linoleum Flooring (S1003R) The Hometime crew installs sheet and tile linoleum on the Hometime log cabin basement floor.
12/25/10 Cabin Kitchen Upgrade (S1004R) The Hometime crew modifies and upgrades cabinets, appliances, countertops and plumbing fixtures.