HOW-TO INFO ON TV STORE ABOUT US SEARCH
transparent
transparent transparent
 
 
transparenttransparent
On TV
transparent transparent
Past Shows
PBS Syndication PBS Syndication
 
Broadcast Partners

2011 Syndication Schedule

Episode Title Episode synopsis
1/1/11 Vacation Home Laundry Room (S1005R) The Hometime crew adds new cabinets and plumbing fixtures to a log cabin lower level.
Attic Trusses
(S1009) The Hometime crew shores up the block walls then uses attic trusses to create a room over a flat-roofed, detached garage. (Part 1 of 3)
Standalone Garage (S1010) The Hometime crew seals up the exterior of the garage and the new studio above it. (Part 2 of 3)
Yoga Studio (S1011) The upstairs studio gets paint, flooring, and lighting.  The downstairs garage gets flooring and cabinets. (Part 3 of 3)
1/29/11 Great Room Hardwood Floor (S924R) The Hometime crew installs a super-hard, prefinished wood floor.
2/5/11 Travertine Floor (S925R) The Hometime crew installs large-format limestone flooring.
2/12/11 Granite Bar Top (S926R) The Hometime crew rebuilds a basement entertainment area.
2/19/11 Heat & Light (S1006R) The Hometime crew installs an ultra-efficient furnace and some one-of-a-kind, hand blown glass light fixtures.
Sculpture Studio: Framing
(S1012) The Hometime crew converts an unused, tuck-under garage into a metal-working studio with a new heater and a downsized garage door. (Part 1 of 5)
Sculpture Studio: Finishing
(S1013) The Hometime crew wraps up the workshop with doors, windows and welding equipment. (Part 2 of 5)
Sculpture Studio Extension – Floor
(S1014) The Hometime crew uses pavers and retaining walls to capture space under a second-story deck. (Part 3 of 5)
Sculpture Studio Extension – Walls
(S1015) The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck. (Part 4 of 5)
Sculpture Studio Extension – Wrap-Up
(S1016) The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture. (Part 5 of 5)
4/2/11 Digging Out the Yard (S1001R) The Hometime crew re-grades a sloping back yard, installs a drainage system, and begins building a series of paver patios.  (Part 1 of 2)
4/9/11 Urban Terraces (S1002R) The Hometime crew weaves several retaining walls, steps, and patios into a small, sloped back yard.  (Part 2 of 2)
4/16/11 Caretaker’s Home (S1007R) The Hometime crew restores the porch of what was once the caretaker’s home on a 40-acre, turn-of-the-century lakeside estate.
4/23/11 Entrance Plaza (S1008R) The Hometime crew renovates a church courtyard with a textured concrete walkway, custom wood benches, and a raised planting bed.
4/30/11 Vacation Home Laundry Room (S1005R) The Hometime crew adds new cabinets and plumbing fixtures to a log cabin lower level.
5/7/11 Panelized House (S1017) Hometime explores the growing trend of pre-building a home in a controlled warehouse setting and then shipping it to a job site for assembly.
Idea Homes
(S1018) Hometime tours two striking homes on display during a home and garden show and analyzes them with the architects, designers and builders.
Closet Organizers
(S1019) Hometime explores the storage options for closets.
Wine Cellar
(S1020) Hometime builds a sophisticated racking system and installs a climate control unit.
6/4/11 Side Porch (S1021) Hometime builds massive decorative wood brackets for the porch, puts shelves in the workshop and takes the new kitchen for a test drive with a local celebrity chef.
Workshop
(S1022) Sophisticated tool storage systems and a custom workbench.
Sculpture Studio: Framing
(S1012R) The Hometime crew converts an unused, tuck-under garage into a metal-working studio with a new heater and a downsized garage door. (Part 1 of 5)
Sculpture Studio: Finishing
(S1013R) The Hometime crew wraps up the workshop with doors, windows and welding equipment. (Part 2 of 5)
Home Theater
(S1023) The latest in TV technology and automated controls for entertainment equipment. Plus more work on the cedar brackets.
Roller Screen Pockets
(S1024) Some clever carpentry to build hidden compartments to hide the motorized roller screens on the porch.
Sculpture Studio Extension – Floor
(S1014R) The Hometime crew uses pavers and retaining walls to capture space under a second-story deck. (Part 3 of 5)
Sculpture Studio Extension – Walls
(S1015R) The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck. (Part 4 of 5)
Sculpture Studio Extension – Wrap-Up
(S1016R) The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture. (Part 5 of 5)
8/6/11 Caretaker’s Home (S1007R) The Hometime crew restores the porch of what was once the caretaker’s home on a 40-acre, turn-of-the-century lakeside estate.
Attic Trusses
(S1009R) The Hometime crew shores up the block walls then uses attic trusses to create a room over a flat-roofed, detached garage. (Part 1 of 4)
Standalone Garage (S1010R) The Hometime crew seals up the exterior of the garage and the new studio above it. (Part 2 of 4)
Yoga Studio (S1011R) The upstairs studio gets paint, flooring, and lighting.  The downstairs garage gets flooring and cabinets. (Part 3 of 4)
His & Her Garage (S1025) The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for “him.” (Part 4 of 4)
9/10/11 Watertight & Energy Efficient (S1026) New products to seal up and insulate a home.
9/17/11 Kitchen Countertop (S1101) Upgrading a tired laminate countertop to the latest quartz material. Also, the newest advances in furnace technology.
9/24/11 (S1102) A tumbled stone backsplash and a super-efficient heat pump.
10/1/11 Stone Cottage – Cul-De-Sac Prep
(S1103) The Hometime crew works with surveyors, graders and architects to prepare a building site.
10/8/11 Stone Cottage – Concrete & Foam
(S1104) The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls.
10/15/11 Stone Cottage – Instant House
(S1105) The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation.
10/22/11 Stone Cottage – Roofscape
(S1106) The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place.
10/29/11 Stone Cottage – Windows
(S1107) The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system.
11/5/11 Stone Cottage – Concrete Floors
(S1108) The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors.
Stone Cottage – Inner Workings
(S1109) The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding.
His & Her Garage (S1025R) The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for “him.”
11/26/11 Watertight & Energy Efficient (S1026R) New products to seal up and insulate a home.
12/3/11 Kitchen Countertop (S1101R) Upgrading a tired laminate countertop to the latest quartz material. Also, the newest advances in furnace technology.
(S1102R) A tumbled stone backsplash and a super-efficient heat pump.
Caretaker’s Home (S1007R) The Hometime crew restores the porch of what was once the caretaker’s home on a 40-acre, turn-of-the-century lakeside estate.
Panelized House (S1017R) Hometime explores the growing trend of pre-building a home in a controlled warehouse setting and then shipping it to a job site for assembly.
Idea Homes
(S1018R) Hometime tours two striking homes on display during a home and garden show and analyzes them with the architects, designers and builders.