HOW-TO INFO ON TV STORE ABOUT US SEARCH
transparent
transparent transparent
 
 
transparenttransparent
On TV
transparent transparent
Past Shows
PBS Syndication PBS Syndication
 
Broadcast Partners

2012 Syndication Schedule

Episode Title Episode synopsis
Stone Cottage – Insulation
(S1110) The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.
Stone Cottage – Geothermal
(S1111) The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.
1/21/12 Stone Cottage – Interior Walls
(S1112) After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.
1/28/12 Stone Cottage – Vaulted Ceiling (S1113) The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.
2/4/12 Stone Cottage – Millwork (S1114) Wooden beams are built outside for the porches.  Inside, hardwood trim wainscoting is installed.
2/11/12 Stone Cottage – Exterior Doors (S1115)  The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.
2/18/12 Stone Cottage – Tile (S1116) The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.
2/25/12 Stone Cottage – Driveway (S1117) The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.
3/3/12 Stone Cottage – Interior Doors (S1118) The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.
3/10/12 Stone Cottage – Laundry Room (S1119) The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.
3/17/12 Stone Cottage – Office (S1120) The home office begins to take shape, as the custom staircase work begins.
3/24/12 Stone Cottage – Countertops (S1121) The stone countertops are fabricated and installed.
3/31/12 Stone Cottage – Fixtures & Appliances (S1122) The Hometime crew installs bathroom fixtures and appliances for the kitchen and laundry.
4/7/12 Stone Cottage – Retractable Screens (S1123) The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed. 
4/14/12 Stone Cottage – Sod & Stone (S1124) The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.
4/21/12 North Wood Trees (S1125) Replacing storm-damaged trees with new native species along with building and stocking a new firewood crib.
4/28/12 Stamped Concrete Patio Demo (S1126) Removing existing concrete to repair moisture damage, redo framing for storage area below and covering with leak-proof membrane.
5/5/12 Stamped Concrete Patio Re-Pour (S1127) New concrete is poured, stamped and finished to complete the patio repairs.
Attic Trusses
(S1009R2) The Hometime crew shores up the block walls then uses attic trusses to create a room over a flat-roofed, detached garage. (Part 1 of 4)
Standalone Garage (S1010R2) The Hometime crew seals up the exterior of the garage and the new studio above it. (Part 2 of 4)
Yoga Studio (S1011R2) The upstairs studio gets paint, flooring, and lighting.  The downstairs garage gets flooring and cabinets. (Part 3 of 4)
His & Her Garage (S1025R2) The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for “him.” (Part 4 of 4)
6/9/12 North Wood Trees (S1125R) Replacing storm-damaged trees with new native species along with building and stocking a new firewood crib.
6/16/12 Stamped Concrete Patio Demo (S1126R) Removing existing concrete to repair moisture damage, redo framing for storage area below and covering with leak-proof membrane.
6/23/12 Stamped Concrete Patio Re-Pour (S1127R) New concrete is poured, stamped and finished to complete the patio repairs.
6/30/12 Timber Shed Wall Framing (S1128) Pre-building shed walls inside using timber frame techniques and re-building the shed on a new slab outside at the Log Cabin.
7/7/12 Timber Shed Roof Framing (S1129) Finishing the new timber frame roof framing with pre-cutting and fitting inside back home and final assembly at the Log Cabin.
7/14/12 Heating and Ventilation Updates (S1130) How to automate ventilation in a storage area along with the best ways to update a hot water heating system for energy efficiency.
7/21/12 Finishing the Built-In Grill (S1131) Attaching granite tops on a natural stone island and setting the built-in grill in place.
7/28/12 Timber Shed Doors (S1132) Construction resumes on the north woods shed with a set of custom carriage house style doors and paver flooring inside.
8/4/12 Heating and Ventilation Updates (S1130R) How to automate ventilation in a storage area along with the best ways to update a hot water heating system for energy efficiency.
8/11/12 Finishing the Built-In Grill (S1131R) Attaching granite tops on a natural stone island and setting the built-in grill in place.
8/18/12 Island Kitchen Cabinets (S1133) The Island Kitchen update begins with cabinet plan options at the designers, a visit to the factory and installation.
8/25/12 Island Kitchen Countertops (S1134) Wrapping up the cabinets and installing new countertops.
9/1/12 Timber Shed Wall Framing (S1128R) Pre-building shed walls inside using timber frame techniques and re-building the shed on a new slab outside at the Log Cabin.
9/8/12 Timber Shed Roof Framing (S1129R) Finishing the new timber frame roof framing with pre-cutting and fitting inside back home and final assembly at the Log Cabin.
9/15/12 Island Kitchen Cabinets (S1133R) The Island Kitchen update begins with cabinet plan options at the designers, a visit to the factory and installation.
9/22/12 Island Kitchen Countertops (S1134R) Wrapping up the cabinets and installing new countertops.
9/29/12 Island Kitchen Appliances (S1135) Finishing up the island kitchen with new appliances and lighting.
10/6/12 Timber Shed Doors (S1132R) Construction resumes on the north woods shed with a set of custom carriage house style doors and paver flooring inside.
10/13/12 Timber Shed Roof and Stone (S1201) Wrapping up the exterior portion of the paver treatment in front of the shed and starting both the clay tile roofing and the natural stone siding.
10/20/12 Island Kitchen Cabinets (S1133R2) The Island Kitchen update begins with cabinet plan options at the designers, a visit to the factory and installation.
10/27/12 Island Kitchen Countertops (S1134R2) Wrapping up the cabinets and installing new countertops.
11/3/12 Island Kitchen Appliances (S1135R) Finishing up the island kitchen with new appliances and lighting.
11/10/12 Stone Cottage – Finishing the Trim (S1202) Varnishing the cherry millwork, applying stone on the basement fireplace and wrapping up the irrigation.
11/17/12 Stone Cottage – Porch Railing (S1203) The metal railing gets built, sandblasted, powder coated and installed while the garage walls and ceiling are paneled.
11/24/12 Stone Cottage – Lighting (S1204) The recessed lights, hanging lights, and surface-mounted fixtures are installed.
12/1/12 Stone Cottage – Kitchen & Baths (S1205) Installation of state-of-the-art lighting controls, undercabinet lights, and mirrors finishes off the kitchen and bathrooms.
12/8/12 Timber Shed Finishing Up (S1206) Installing windows, wood-burning stove with stainless steel chimney, mortise hardware and storage system.
12/15/12 Stone Cottage – Lower Level (S1207) Finishing the gas fireplace, wet bar tile and workshop walls and ceiling.
12/22/12 Stone Cottage – Storage (S1208) Installing cabinets and hanging storage for the garage and the workshop.
12/29/12 Stone Cottage – Carpet (S1209) Preparing and installing area rugs, stair runners and wall-to-wall carpet and testing out the new central vacuum.