HOW-TO INFO ON TV STORE ABOUT US SEARCH
transparent
transparent transparent
 
 
transparenttransparent
On TV
transparent transparent
Past Shows
PBS Syndication PBS Syndication
 
Broadcast Partners

Syndication Schedule - 2013 Season

Episode Title Episode synopsis
1/5/13 Stone Cottage – Electronics (S1210) Installing and operating the home theater, the lighting control system, and the whole-house audio.
1/12/13 Clean, Green and Efficient (S1211) Critical septic and electrical upgrades for a vacation home
1/19/13 Security Goes Wireless (S1212) Wireless home security components, anti-scald, thermostatic bath valves and lead-safe remodeling practices
1/26/13 Stone Cottage – Closet Organizers (S1213) Hometime explores the storage options for closets and installs a discrete fireplace screen
2/2/13 Stone Cottage – Wine Cellar (S1214) Hometime builds a sophisticated wine cellar racking system and installs a climate control unit
2/9/13 Stone Cottage – Side Porch (S1215) Hometime builds massive decorative wood brackets and gives a new kitchen a test run with a local celebrity chef
2/16/13 Stone Cottage – Workshop (S1216) Sophisticated tool storage systems and a custom workbench
2/23/13 Stone Cottage – Home Theater (S1217) The latest in TV technology and automated controls for entertainment equipment
3/2/13 Stone Cottage – Outdoor Kitchen Island (S1218) Hometime builds an outdoor cooking island and anchors an outdoor lamp post.  Plus an explanation of the computerized lighting system.
3/9/13 Stone Cottage – Built-In Grill (S1219) Hometime sets an outdoor grill into a stone and granite island. Also, the mechanics of a modern player piano.
3/16/13 Stone Cottage – Mailbox & Flower Box (S1220) Thoughtful design and careful carpentry tie mailboxes and a flower box to the architectural style of a home.
3/23/13 Stone Cottage – Cottage Expressions (S1221) Building full extension drawers, attaching snow guards and exploring a home’s cottage style.
3/30/13 Stone Cottage – Insulation
(S1110R) The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.
4/6/13 Stone Cottage – Geothermal
(S1111R) The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.
4/13/13 Stone Cottage – Interior Walls
(S1112R) After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.
4/20/13 Stone Cottage – Vaulted Ceiling (S1113R) The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.
4/27/13 Stone Cottage – Millwork (S1114R) Wooden beams are built outside for the porches.  Inside, hardwood trim wainscoting is installed.
5/4/13 Stone Cottage – Exterior Doors (S1115R)  The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.
5/11/13 Stone Cottage – Tile (S1116R) The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.
5/18/13 Stone Cottage – Driveway (S1117R) The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.
5/25/13 Stone Cottage – Interior Doors (S1118R) The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.
6/1/13 Stone Cottage – Laundry Room (S1119R) The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.
6/8/13 Stone Cottage – Office (S1120R) The home office begins to take shape, as the custom staircase work begins.
6/15/13 Stone Cottage – Countertops (S1121R) The stone countertops are fabricated and installed.
6/22/13 Stone Cottage – Fixtures & Appliances (S1122R) The Hometime crew installs bathroom fixtures and appliances for the kitchen and laundry.
6/29/13 Stone Cottage – Retractable Screens (S1123R) The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed. 
7/6/13 Stone Cottage – Sod & Stone (S1124R) The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.
7/13/13 Stone Cottage – Finishing the Trim (S1202R) Varnishing the cherry millwork, applying stone on the basement fireplace and wrapping up the irrigation.
7/20/13 Stone Cottage – Porch Railing (S1203R) The metal railing gets built, sandblasted, powder coated and installed while the garage walls and ceiling are paneled.
7/27/13 Stone Cottage – Lighting (S1204R) The recessed lights, hanging lights, and surface-mounted fixtures are installed.
8/3/13 Stone Cottage – Kitchen & Baths (S1205R) Installation of state-of-the-art lighting controls, undercabinet lights, and mirrors finishes off the kitchen and bathrooms.
8/10/13 Stone Cottage – Lower Level (S1207R) Finishing the gas fireplace, wet bar tile and workshop walls and ceiling.
8/17/13 Stone Cottage – Storage (S1208R) Installing cabinets and hanging storage for the garage and the workshop.
8/24/13 Stone Cottage – Carpet (S1209R) Preparing and installing area rugs, stair runners and wall-to-wall carpet and testing out the new central vacuum.
8/31/13 Stone Cottage – Electronics (S1210R) Installing and operating the home theater, the lighting control system, and the whole-house audio.
9/7/13 Sun Porch Rejuvenation (S1222) See how new doors, finished millwork and a ceiling fan brighten up an aging sun porch.
9/14/13 New Home Beginnings 1 (S1223) Foundation, framing and heating on a new home construction site.
9/21/13 New Home Beginnings 2 (S1224) Roof Framing and decorative timber trusses at the new home site.
9/28/13 New Home Beginnings 3 (S1225) Windows and doors at the new home.
10/5/13 Small Yards 1 (S1301) Hometime helps two neighbors design and install coordinated landscapes on smaller, adjacent lots.
10/12/13 Small Yards 2 (S1302) The Hometime team pitches in to work a pillar and a seating wall into the hardscaping on a smaller yard.
10/19/13 Hillside Home: Windows (S1303) Hometime explores the blending of exterior elements in new home construction with a focus on windows as well as the installation of a landscape bridge.
10/26/13 Hillside Home: Roofing (S1304) Dean and Miriam frame and deck the new landscape bridge as the home's roof gets covered with copper and synthetic slate
11/2/13 Hillside Home: Siding (S1305) The new landscape bridge is ready for railings and a beautiful set of steps ias the new home gets a complete system of siding, soffits, fascia and trim.
11/9/13 Hillside Home: Doors and Stone (S1306) TThe new home's architecture is enhanced with continuity of garage doors, entry doors and shutters as the foundation is covered with natural thin veneer stone.
11/16/13 Hillside Home: Driveway and Walkway (S1307) Dean, Miriam, Dand Bucky pitch in to install a paver driveway, walkway and step veneer.
11/23/13 Hillside Home: Landscape Wrap (S1308) Finishing a hilly back yard with landscape steps and tile, a fire ring, plants and sprinklers.
11/30/13 Uptown Kitchen 1 (S1309) Dean, Miriam and the Hometime crew begin updating the 1970's remodel of a 1911 kitchen with new windows and a new patio door in the bumpout.
12/7/13 Uptown Kitchen 2 (S1310) Double hung windows are updated with new inserts as Hometime guts the kitchen and reframes the powder room for a pocket door.
12/14/13 Uptown Kitchen 3 (S1311) Dean and Miriam finish up rough-ins, insulation, drywall and priming to get ready for new cabinets.
12/21/13 Uptown Kitchen 4 (S1312) Dean and Miriam show how to blend two different finishes as they install new cabinets.
12/28/13 Uptown Kitchen 5 (S1313) Dean and Miriam get the kitchen, mud room and powder room areas ready for new flooring and countertops.