Basement Headroom
S912R, scheduled re-release is 6/19/10
Patching the Slab
S913R, scheduled re-release is 6/26/10
Basement Plaster
S914R, scheduled re-release is 7/3/10
Dean, Miriam and the Hometime crew reclaim unusable basement space by abating the asbestos, removing low-hanging pipes, and re-working drains in the floor. They work with the radon mitigation contractor, re-pour some of the concrete floor, and get the basement spaces wired. And they finish the basement walls with an improvised plaster texture to match the original 1926 surfaces. |