Basement Headroom
2221, scheduled re-release is 6/20/09
Patching the Slab
2222, scheduled re-release is 6/27/09
Basement Plaster
2223, scheduled re-release is 7/4/09
Dean, Miriam and the Hometime crew reclaim unusable basement space by abating the asbestos, removing low-hanging pipes, and re-working drains in the floor. They work with the radon mitigation contractor, re-pour some of the concrete floor, and get the basement spaces wired. And they finish the basement walls with an improvised plaster texture to match the original 1926 surfaces. |