Building a New Home, continued

With the exterior of the house almost complete, Dean and Susanne follow progress on the inside of the house. They show options you have in choosing fireplaces, stairways, floor coverings, and countertops. (Part 7 of 8).

Dean and Susanne wrap up the construction of this New House project. Some final fixtures and floor coverings are installed, they have a final walk-through, and they prepare for a photo shoot with Better Homes and Gardens. (Part 8 of 8).

(Original broadcast dates - 12/19/92, 12/26/92)



Ceramic Tile
American Olean Tile Co.
215-855-1111


Kitchen and Bathroom Cabinets
Merillat Industries Inc.
800-624-1250


Plumbing Fixtures
Kohler Company
800-456-4537


Wallpaper
Waverly
800-423-5881


Windows
Marvin Windows and Doors
800-346-5128


Vinyl Floor Tiles
Armstrong World Industries
800-233-3823


Central Vacuum and Ventilating Fans
Broan Manufacturing
800-558-1711



Light Fixtures
Progress Lighting
215-289-1200


Home Builder
Joe Miller Homes
952-454-4663


Better Homes and Garden
House featured in October 1993 issue

 

Also Available:
Our Building a New Home videos and study plan
are both available in the Hometime Store.



Store | On TV | How-To | About Us | Search | Contact Us | Site Map | Advertising
VHS / DVDs | Books | Plans | Hardware | Clothing | Specials

©2005 Hometime Video Publishing, Inc.
view cart help Home SITE MAP CONTACT US SEARCH ABOUT US HOW-TO STORE ON TV