Finishing a Lower Level

Dean Johnson and Robin Hartl finish off the lower level of house they recently built. They explain factors to consider before upgrading a basement, how to hide mechanical obstructions and maintain architectural balance, and how to alter plumbing rough-ins under concrete slab. (Part 1 of 6).

Dean and Robin continue work in the lower level, showing first how to maximize headroom in basements with low-hanging mechanical systems, explaining the Rumford fireplace construction and roughing in a steam-shower unit and a whirlpool tub. (Part 2 of 6).

(Original broadcast dates - 2/17/96, 2/24/96)



Concept Plans
Dan Nepp
Tom Ellison Architects, Inc.
612-929-2800


Addition Plans
LifeStyle HomeDesign Services
800-446-6366


Banking Services
First Bank
800-285-7575


Asbestos Abatement
Envirobate
612-729-1080


Pneumatic Nailer
Stanley-Bostitch
800-556-6696


Fireplace Stone
Buechel Stone Corp.
414-849-9361


Steam-Shower Unit and Whirlpool Tub
Kohler
800-4-KOHLER


Recessed Lights
Halo
800-553-9765


Programmable Lighting System
LiteTouch, Inc.
801-268-8668

 

Also Available:
Our Lower Level Construction video is available in the Hometime Store.



Store | On TV | How-To | About Us | Search | Contact Us | Site Map | Advertising
VHS / DVDs | Books | Plans | Hardware | Clothing | Specials

©2005 Hometime Video Publishing, Inc.
view cart help Home SITE MAP CONTACT US SEARCH ABOUT US HOW-TO STORE ON TV