| Finishing
a Lower Level, continued
Dean
Johnson and Robin Hartl progress work in the lower level, hanging gypsum base
for the veneer plaster system and hiring out the 2-coat plaster application. They
also explain a new steam-humidification system as it goes in, and they panel the
sauna in the new bathroom downstairs. (Part 3 of 6).
Dean and Robin show how to install a suspended coffered ceiling as they continue
work downstairs, and they trim out the windows, doors and decorative columns with
special applications. (Part 4 of 6). (Original
broadcast dates - 3/2/96, 3/9/96)
|