| Lodge-Style
Log Home, continued
Dean and Robin show how to cut out
unneeded sections of tie log over the great room, and they talk to Dick Biscobing
and his crew about the installation of the log stairway. In addition, the white
oak trim and the new cabinets are delivered, and tile contractor Troy Stolpe begins
installing the filled and honed limestone floor tiles in the master bath. (Part
9 of 15). Dean
and Robin install kitchen cabinets and get ready for countertops. Larry Stolpe
begins laying the soapstone tile floor in the lower level bathroom. And Dean visits
a recreational gaming showroom to browse through various home options.
(Part 10 of 15). (Original
broadcast dates - 3/13/99, 3/20/99)
|