Finishing a Lower Level: Show Index

A series of six programs detailing the finishing of the House with Character lower level with new bath, sauna, fireplace, veneer plaster, suspended coffered ceiling, cabinets, entertainment center, programmable lighting, game room and exercise area.

(Originally broadcast February-March 1996, rebroadcast July-August 1996)


Finishing a Lower Level: Framing
Framing partition walls, soffits and columns; and removing part of the basement slab to re-do the plumbing rough-in.

Finishing a Lower Level: Rough-Ins
Roughing-in the plumbing and electrical, and setting in the whirlpool. A masonry fireplace is constructed.

Finishing a Lower Level: Drywall
Insulating the walls and soffits; drywall the ceilings and walls; and building a custom-cut sauna.

Finishing a Lower Level: Finish Carpentry
Installing a coffered ceiling, columns, millwork, and doors.

Finishing a Lower Level: Paint and Varnish
Trimming-out plumbing; installing cabinets and countertops; paint and varnish.

Finishing a Lower Level: Final Touches
Finishing the lower level project; trimming-out electrical; installing flooring; installing hardware; installing home theater.

Finishing a Lower Level: Floor Plans


 

Also Available:
Our House with Character videos or study plan
are both available in the Hometime Store.

©2005 Hometime Video Publishing, Inc.
view cart help Home SITE MAP CONTACT US SEARCH ABOUT US HOW-TO STORE